Pipeline Dig ups (22/24" Pipe)

  1. Home
  2. Project
  3. Pipeline Digs 22/24″ Pipe

The scope of work encompassed various tasks, including site location, service identification, and weld identification, followed by mechanical excavation. We conducted the removal of existing coatings, abrasive blasting, and employed non-destructive testing (NDT) methods such as Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), as well as corrosion and mechanical damage measurements. After repairs, we ensured meticulous recoating, backfill, and reinstatement. The dig sites were located in the remote region of the Cooper Basin, and all digs were completed within 10 weeks and within budget, demonstrating our commitment to efficiency and quality.

project gallery

location

Cooper Basin, South Australia

Total No. of Digs

17

Total Length of Digs

180m

Project Duration

10 Weeks

Existing Coating

FBE & Plicoflex Tape

New Coating

Denso Protal 7700

Anomalies

Corrosion and Weld Anomalies

Repairs

Welded Sleeves