Pipe Line Digs (14" Pipeline)

  1. Home
  2. Project
  3. Pipeline Digs – 14” Pipe

The scope of work encompassed various tasks, including site location, service identification, and weld identification, followed by mechanical excavation. We conducted the removal of existing coatings, abrasive blasting, and employed non-destructive testing (NDT) methods such as Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), as well as corrosion and mechanical damage measurements. After repairs, we ensured meticulous recoating, backfill, and reinstatement. The dig sites were located in the remote region of the Cooper Basin, and all digs were completed within 3 weeks and within budget, demonstrating our commitment to efficiency and quality.

project gallery

location

Cooper Basin, South Australia

Total No. of Digs

6

Total Length of Digs

36m

Project Duration

3 Weeks

Existing Coating

Polyken 2 Layer Tape

New Coating

Denso Protal 7700

Anomalies

Corrosion

Repairs

Clock Springs Composite