The scope of work encompassed various tasks, including site location, service identification, and weld identification, followed by mechanical excavation. We conducted the removal of existing coatings, abrasive blasting, and employed non-destructive testing (NDT) methods such as Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), as well as corrosion and mechanical damage measurements. After repairs, we ensured meticulous recoating, backfill, and reinstatement. The dig sites were located in the remote region of the Cooper Basin, and all digs were completed within 3 weeks and within budget, demonstrating our commitment to efficiency and quality.
location
Cooper Basin, South Australia
Total No. of Digs
6
Total Length of Digs
36m
Project Duration
3 Weeks
Existing Coating
Polyken 2 Layer Tape
New Coating
Denso Protal 7700
Anomalies
Corrosion
Repairs
Clock Springs Composite